Est. 2014
Here are the before and after photos of the renovation of this beautiful home in Brighton, NY
The Beginning
The Beginning
Everything started with a pressure wash on a rainy day. It was fun! Then, followed by a sunny day, it was enough for it to dry, so the preparation process can start.
The Preparation Process
The Preparation Process
Peeling paint was removed and primer was applied to the siding and trims. Minor patching was done.
Deck Repair
Deck Repair
Part of the scope was to replace some pieces of rotten wood and to build a new step to replace a broken one. As usual, we took the measurements and did some research to find the same type of wood.
AFTER DONE